MAJOR PROJECTS

RESUME

This list describes the scale and scope of our major project construction division. This is not an exhaustive list as we routinely work on a multitude of projects. For an up-to-date resume, please contact our business development team.

TOLKO HIGH PRAIRIE OSB MILL

Work consisted of rebuilding the forming, press, and finishing lines of the OSB mill. This included all new electrical distribution, control systems, fire monitoring system, new high bay LED lighting, commissioning support, and all supporting infrastructure necessary for these systems.

Location
High Prairie, AB
Approx. contract
 value
$15M-$20M
PROJECT DURATION
12 Months

PACIFIC CANBRIAM PHASE IV EXPANSION

Installation and commissioning of all new equipment related to the facility, tank farm, and bullet areas expansion. This included new generator package, 4160v distribution, inlet separation, compression, refrigeration, de-ethanizer, and all associated electrical, instrumentation, control systems, and supporting infrastructure necessary for these systems.

Location
Hudson's Hope, BC
Approx. contract
 value
$5M - $10M
PROJECT DURATION
12 Months

GIBSON TANK STORAGE FACILITY

Work included new electrical distribution and control system integration, electrical heat trace, security cameras and sensors, yard and tank lighting, instrumentation and controls, commissioning support, as well as all supporting infrastructure necessary for these systems.

Location
Edmonton, AB
Approx. contract
value
$2.5M-$5M
PROJECT DURATION
6 Months

CARBON MANAGEMENT CANADA CARBON CAPTURE, UTILIZATION & STORAGE FACILITY

CDN’s role was to interpret the design and functionality of the facility to meet Canadian industry standards. CDN was responsible for securing land approvals, permitting, surveying, pipeline crossing agreements, initial feed study engineering, full detailed engineering, lease road and fence building, septic tank and cable/pipe trenching, electric service and instrumentation and control equipment.

Location
Brooks, AB
Approx. contract
value
$2.5M-$5M
PROJECT DURATION
12 Months

CONUMA COAL WATER TREATMENT PLANT

Installation and commissioning of all LV power from plant transformers, LV MCC equipment, racking, cabling, motor control, power distribution from utility distribution boards, fiber optic network, cable supports and mounting brackets necessary for these systems.

Location
Chetwynd, BC
Approx. contract
value
$5M-$10M
PROJECT DURATION
6 Months

ARC WELLPAD & PREWIRE

Fabrication, installation, and commissioning of all new equipment required to complete the wellpad program. This included pre-fabrication of rack modules, meter skids, process buildings, and electrical and control system buildings. Site installation of all required equipment for each unique wellpad and supporting infrastructure necessary for these systems.

Location
Grande Prairie, AB, Edmonton, AB, Calgary, AB, Dawson Creek, AB, Fort St. John, BC
Approx. contract
value
$5M-$10M
PROJECT DURATION
12 Months

BOREA WHEATCREST SOLAR

CDN handled all the electrical work for this 75 MW solar project, covering everything after the substation. They installed 16 power inverters and Vista switch pads, 290 combiner boxes, and setup over 6,400 meters of above-ground electrical cabling and managed off-site assembly of wiring for the solar panels for increased installation efficiency.

Location
Taber, AB
Approx. contract
value
$2.5M-$5M
PROJECT DURATION
5 Months

NUVISTA 06-19 WEMBLEY COGEN PROJECT

Installation of one Titan 130 gas turbine generator with waste hear recovery unit (WHRU). Providing 12.2 to 18.3 MW of power, this system includes a thermal hot oil system, atmospheric tank, stabilizer recoiler, instrument air compressor addition.

Location
Grande Prairie, AB
Approx. contract
value
$5M-$10M
PROJECT DURATION
3.5 Months

PEMBINA PHASE 8 EXPANSION

Upgraded five main pump stations by installing new mainline and booster pumps. Also added new motor control centre (MCC) buildings to support a 5KV power system upgrade for the pumps.

Location
Whitecourt AB, Geoffrey Lake AB, Valleyview AB, La Glace AB, Wapiti AB
Approx. contract
value
$10M-$15M
PROJECT DURATION
12 Months

ARC ATTACHIE WELLPADS 2024

Completion of prewiring packaged in Calgary to support the construction of 4 new multi-well pads, followed by construction of the 4 wellpads.

Location
Attachie, BC
Approx. contract
value
$2.5M-$5M
Project duration
5 Months

2024 ARC BULK KAKWA PRE-WIRE

This year-long 2024 project involved the complete electrical and instrumentation installation and commissioning of five combo test separator buildings, 37 wet meter modules, and 30 Piperack modules.

Location
Kakwa, AB
Approx. contract
value
$1M - $2.5M
PROJECT DURATION
12 Months

CDN Controls is a fully-integrated, people-focused, one-stop-shop for Instrumentation & Electrical services in Western Canada. Our fully-integrated model means we are capable of tackling any project, and we guarantee we will meet or exceed your expectations. Leading the industry since 2011, we also specialize in automation, communication, measurement, meter proving, combustion and emissions services, and more. Functioning on a commitment to high-quality work, outstanding customer service, and unparalleled reliability, it’s no question CDN Controls is a leader in Instrumentation & Electrical throughout Western Canada.