MAJOR PROJECTS
RESUME
TOLKO HIGH PRAIRIE OSB MILL
Work consisted of rebuilding the forming, press, and finishing lines of the OSB mill. This included all new electrical distribution, control systems, fire monitoring system, new high bay LED lighting, commissioning support, and all supporting infrastructure necessary for these systems.
Location
High Prairie, AB
Approx. contract value
PROJECT DURATION
12 Months
PACIFIC CANBRIAM PHASE IV EXPANSION
Installation and commissioning of all new equipment related to the facility, tank farm, and bullet areas expansion. This included new generator package, 4160v distribution, inlet separation, compression, refrigeration, de-ethanizer, and all associated electrical, instrumentation, control systems, and supporting infrastructure necessary for these systems.
Location
Hudson's Hope, BC
Approx. contract value
PROJECT DURATION
12 Months
GIBSON TANK STORAGE FACILITY
Work included new electrical distribution and control system integration, electrical heat trace, security cameras and sensors, yard and tank lighting, instrumentation and controls, commissioning support, as well as all supporting infrastructure necessary for these systems.
Location
Edmonton, AB
Approx. contract value
PROJECT DURATION
6 Months
CARBON MANAGEMENT CANADA CARBON CAPTURE, UTILIZATION & STORAGE FACILITY
CDN’s role was to interpret the design and functionality of the facility to meet Canadian industry standards. CDN was responsible for securing land approvals, permitting, surveying, pipeline crossing agreements, initial feed study engineering, full detailed engineering, lease road and fence building, septic tank and cable/pipe trenching, electric service and instrumentation and control equipment.
Location
Brooks, AB
Approx. contract value
PROJECT DURATION
12 Months
CONUMA COAL WATER TREATMENT PLANT
Installation and commissioning of all LV power from plant transformers, LV MCC equipment, racking, cabling, motor control, power distribution from utility distribution boards, fiber optic network, cable supports and mounting brackets necessary for these systems.
Location
Chetwynd, BC
Approx. contract value
PROJECT DURATION
6 Months
ARC WELLPAD & PREWIRE
Fabrication, installation, and commissioning of all new equipment required to complete the wellpad program. This included pre-fabrication of rack modules, meter skids, process buildings, and electrical and control system buildings. Site installation of all required equipment for each unique wellpad and supporting infrastructure necessary for these systems.
Location
Grande Prairie, AB, Edmonton, AB, Calgary, AB, Dawson Creek, AB, Fort St. John, BC
Approx. contract value
PROJECT DURATION
12 Months
BOREA WHEATCREST SOLAR
CDN handled all the electrical work for this 75 MW solar project, covering everything after the substation. They installed 16 power inverters and Vista switch pads, 290 combiner boxes, and setup over 6,400 meters of above-ground electrical cabling and managed off-site assembly of wiring for the solar panels for increased installation efficiency.
Location
Taber, AB
Approx. contract value
PROJECT DURATION
5 Months
NUVISTA 06-19 WEMBLEY COGEN PROJECT
Installation of one Titan 130 gas turbine generator with waste hear recovery unit (WHRU). Providing 12.2 to 18.3 MW of power, this system includes a thermal hot oil system, atmospheric tank, stabilizer recoiler, instrument air compressor addition.
Location
Grande Prairie, AB
Approx. contract value
PROJECT DURATION
3.5 Months
PEMBINA PHASE 8 EXPANSION
Upgraded five main pump stations by installing new mainline and booster pumps. Also added new motor control centre (MCC) buildings to support a 5KV power system upgrade for the pumps.
Location
Whitecourt AB, Geoffrey Lake AB, Valleyview AB, La Glace AB, Wapiti AB
Approx. contract value
PROJECT DURATION
12 Months
ARC ATTACHIE WELLPADS 2024
Completion of prewiring packaged in Calgary to support the construction of 4 new multi-well pads, followed by construction of the 4 wellpads.
Location
Attachie, BC
Approx. contract value
Project duration
5 Months
2024 ARC BULK KAKWA PRE-WIRE
This year-long 2024 project involved the complete electrical and instrumentation installation and commissioning of five combo test separator buildings, 37 wet meter modules, and 30 Piperack modules.
Location
Kakwa, AB
Approx. contract value
PROJECT DURATION
12 Months
CDN Controls is a fully-integrated, people-focused, one-stop-shop for Instrumentation & Electrical services in Western Canada. Our fully-integrated model means we are capable of tackling any project, and we guarantee we will meet or exceed your expectations. Leading the industry since 2011, we also specialize in automation, communication, measurement, meter proving, combustion and emissions services, and more. Functioning on a commitment to high-quality work, outstanding customer service, and unparalleled reliability, it’s no question CDN Controls is a leader in Instrumentation & Electrical throughout Western Canada.